Who We Are

OUR STORY &
HERITAGE.

We are the specialists who build heavy foundations and civil infrastructure. From our inception in 2018 in Surat, Gujarat, we have grown into one of western India’s most dependable deep piling, utility diversion, and civil engineering forces.

GMRC Metro Partner
Surat Municipal Corp (SMC)
DREAM City / SDB Authority
NHAI Highway Corridors
ISO 9001:2015 Certified
G.S. Construction foundation operations in Surat
2018 The Genesis in Surat

FOUNDED WITH A CLEAR MISSION

Established on April 1, 2018, in Surat, Gujarat, G.S. Construction was founded to bring uncompromising engineering rigor, heavy equipment ownership, and transparent execution to western India's rapidly growing infrastructure landscape.

2018 Year Established
100% On-Schedule Delivery
Dahanu Highway Overbridge Engineering Team
2020 Highway Landmark

DAHANU OVERBRIDGE BENCHMARK

Awarded the critical foundation and substructure package for the Dahanu-Mumbai highway overbridge. Our team executed high-load bored piling, pier caps, and monolithic box culvert stormwater diversions under strict traffic management.

100% Quality Compliance
Zero Traffic Disruptions
Surat Metro Rail Phase-1 construction site
2022 - 2026 Metro Rail Authority

SURAT METRO RAIL PHASE-1

Entrusted by Gujarat Metro Rail Corporation (GMRC) and Surat Municipal Corporation (SMC) for vital viaduct foundations and high-pressure trunk utility network realignments (300mm DI Line at Rupali Junction & 1000mm RCC at KNN Surat).

1000mm Trunk Pipeline Shift
40m Bored Piles Depth
Hydraulic rotary piling rig in operation
Fleet Mastery Heavy Geotechnical Engineering

HYDRAULIC ROTARY DRILLING RIGS

Investing continuously in proprietary high-torque hydraulic rotary piling rigs and full-casing oscillators capable of drilling pile diameters from 500mm up to 1500mm in dense clays, silt, and weathered basalt rock strata.

1500mm Max Bore Diameter
ISO 9001:2015 Certified
Night-shift safety lighting and trench shoring
Safety Culture Zero-Incident Commitment

LIFE & SAFETY AS A CARDINAL RULE

Every deep trench excavation is protected with engineered shoring shields, comprehensive gas-monitoring, 100% PPE enforcement, and daily morning Tool-Box Talks (TBT) — achieving over 500,000+ safe man-hours without a single lost-time incident.

500K+ Safe Man-Hours
0 Lost-Time Incidents
WhatsApp Desk